Skip to main content

Skip to current roadwork

Keep 360 Moving

I30 Mobility Task Force

Project Completion
Summer 2012

LOW CLEARANCE BRIDGE

Low Clearance 13 feet 6 inches

SH 360 underpass at Union Pacific Railroad. High loads exit northbound at or prior to Abram Street, exit southbound at or prior to Division Street.

Printable Maps

New Access Map,
March 2012
(PDF)

E-mail Alerts

SUBSCRIBE to convenience!
Sign-up for e-mail alerts sent to your inbox on construction events and lane closures.
You are only a few clicks away from news delivered straight to you!

Podcasts

SH 360 Mobility Coordinator Jason Crawford provides an overview of the SH 360 and Division Street interchange reconstruction project.

Listen to the current podcast:

Download the .mp3 file

Right-click this link and choose ‘Save Target As’ (or ‘Save Link As’).
Podcast transcription (PDF).

I-30 Construction Project

Interstate 30 sign

I-30 Project information

The SH 360/SH 180 Project

The project will alleviate a major bottleneck on SH 360 at the Union Pacific railroad crossing where continuous frontage roads will be constructed and improve interchange operations for SH 360/SH 180 (Division Street).

The bottleneck will be alleviated by constructing a new railroad bridge with a rail capacity increase that will provide the proper width under the bridge to place both the frontage roads and new main lane pavements. The SH 180 bridge will be built just south of the current bridge minimizing impacts to Division Street traffic.

Current Road Work

The following table displays the same work status and lane closure information as on the map above. For more detail on upcoming road work, see the Current Road Work page.

Road Segment Status Work
SH 360 Northbound Mainlanes work ongoing or starting soon
Overnight, May 22, 8 p.m. to May 23, 6 a.m. (weather permitting): SH 360 northbound mainlanes approaching Abram Street will be reduced to one lane as crews switch traffic to the new northbound mainlanes through the Division Street area.
SH 360 Southbound Mainlanes green circle
No planned closures.
SH 360 Northbound Frontage Road green circle
No planned closures.
SH 360 Southbound Frontage Road green circle
No planned closures.
Ramp Exit - SH 360 Northbound to Randol Mill Road/Division Street work ongoing or starting soongreen circle
No planned closures.
Ramp Entrance - SH 180/Division Street to SH 360 Southbound work ongoing or starting soon
March 17 through May 2012: Traffic destined for southbound SH 360 from SH 180/Division Street and Randol Mill Rd will access the highway from the Abram Street entrance ramp as a new entrance ramp is constructed north of Abram Street. See New Access Map for route.
Ramp Exit - SH 360 Southbound to 180/Division Street green circle
No planned closures.
Ramp Entrance - Division Street to SH 360 Northbound green circle
No planned closures.
Ramp Exit - SH 360 Southbound to Abram Street green circlegreen circle
green circle
No planned closures.
Ramp Entrance - Park Row Drive to SH 360 Northbound green circle
No planned closures.
Division Street Eastbound green circlework ongoing or starting soonwork ongoing or starting soon
No planned closures.
Division Street Westbound green circle
No planned closures.
Six Flags Drive green circle
No planned closures.
Centennial Drive green circlework ongoing or starting soonwork ongoing or starting soongreen circle
No planned closures.

For more information, please email the SH 360/SH 180 Mobility Coordinator.