SH 360 underpass at Union Pacific Railroad. High loads exit northbound at or prior to Abram Street, exit southbound at or prior to Division Street.
Permanent Configuration for SH360 Northbound Frontage Road,
January 2012 (PDF)
SUBSCRIBE to convenience!
Sign-up for e-mail alerts sent to your inbox on construction events and lane closures. You are only a few clicks away from news delivered straight to you!
SH 360 Mobility Coordinator Jason Crawford provides an overview of the SH 360 and Division Street interchange reconstruction project.
Right-click this link and
choose ‘Save Target As’ (or ‘Save Link As’).
Podcast transcription (PDF).
The project will alleviate a major bottleneck on SH 360 at the Union Pacific railroad crossing where continuous frontage roads will be constructed and improve interchange operations for SH 360/SH 180 (Division Street).
The bottleneck will be alleviated by constructing a new railroad bridge with a rail capacity increase that will provide the proper width under the bridge to place both the frontage roads and new main lane pavements. The SH 180 bridge will be built just south of the current bridge minimizing impacts to Division Street traffic.
The following table displays the same work status and lane closure information as on the map above. For more detail on upcoming road work, see the Current Road Work page.
| Road Segment | Status | Work |
|---|---|---|
| SH 360 Northbound Mainlanes | January 21, 7 a.m. to 5 p.m. (weather permitting): The right, outside lane of northbound SH 360 will be closed between Park Row Drive and Randol Mill Road for installation of overhead signs and pavement markings, and repositioning of traffic safety barriers. |
|
| SH 360 Southbound Mainlanes | No planned closures.
|
|
| SH 360 Northbound Frontage Road | January 21 (Permanent): Crews will switch traffic on to the new SH 360 northbound frontage road connecting Abram Street to Randol Mill Road. See map for the permanent configuration. |
|
| SH 360 Southbound Frontage Road | No planned closures. |
|
| Ramp Exit - SH 360 Northbound to Division Street | Permanent: The SH 180/Division Street exit ramp is shared with the Randol Mill Road exit. After exiting, follow route signing, guiding right along the new temporary access ramp back to SH 180/Division Street. |
|
| Ramp Exit - SH 360 Northbound to Randol Mill Road/Division Street | January 21 (Permanent): The current SH 360 northbound exit ramp to SH 180/Division Street and Randol Mill road will be moved to a new exit ramp south of SH 180/Division Street.
|
|
| Ramp Entrance - SH 180/Division Street to SH 360 Southbound | No planned closures. |
|
| Ramp Entrance - Division Street to SH 360 Northbound | No planned closures. |
|
| Ramp Entrance - Abram Street to SH 360 Northbound | January 21 (Permanent): The SH 360 northbound entrance ramp from Abram Street will be moved to the existing entrance ramp north of SH 180/Division Street. |
|
| Ramp Entrance - Park Row Drive to SH 360 Northbound | January 21, 7 a.m. to 5 p.m. (weather permitting): The northbound SH 360 entrance ramp from Park Row Drive will be closed in coordination with the single lane closure on SH 360. |
|
| Division Street Eastbound | Daily, January 23-25, 9 a.m. to 4 p.m. (weather permitting): Various lanes of eastbound SH 180/Division Street between Six Flags Drive and 109th Street will be closed for crews to place roadway lighting and small signs.
|
|
| Division Street Westbound | Daily, January 23-25, 9 a.m. to 4 p.m. (weather permitting): Various lanes of westbound SH 180/Division Street between 109th Street and Six Flags Drive will be closed for crews to place roadway lighting and small signs. |
|
| Six Flags Drive | No planned closures. |
|
| Centennial Drive | No planned closures. |
For more information, please email the SH 360/SH 180 Mobility Coordinator.